Year 2020:
Installation of refractory bricks and concrete for the entire line; a total of 3,500 tons of materials were used in the following equipment: Coolers, heating hoods, furnace and precalciner nozzles, tertiary air ducts, rotary kiln, upstream joints and flue boxes, V-chamber and mixing duct, precalciner, cyclones C5-C4-C3-C2-C1, gas ducts, and material ducts. The execution of the refractory project consisted of the following stages: Formal planning and preparation of tasks for each zone: safety procedures, quality control, refractory installation procedures, organization of personnel and equipment, preparation of installation drawings, packing lists, material preparation, site organization, daily and weekly safety reports, daily progress reports, and validation and acceptance of each zone.
Installation of refractory bricks and concrete for the entire line; a total of 3,500 tons of materials were used in the following equipment: Coolers, heating hoods, furnace and precalciner nozzles, tertiary air ducts, rotary kiln, upstream joints and flue boxes, V-chamber and mixing duct, precalciner, cyclones C5-C4-C3-C2-C1, gas ducts, and material ducts. The execution of the refractory project consisted of the following stages: Formal planning and preparation of tasks for each zone: safety procedures, quality control, refractory installation procedures, organization of personnel and equipment, preparation of installation drawings, packing lists, material preparation, site organization, daily and weekly safety reports, daily progress reports, and validation and acceptance of each zone.
Year 2025:
Furnace flue work: Brick removal with jackhammer; furnace bricklaying; brick cutting; tuyere formwork and pouring (AS 160 concrete and nose with R25 concrete); Nosering demolition; Nosering formwork and pouring; downstream retaining ring formwork and pouring; door beam formwork and pouring. visit to the furnace entrance.
Chimney work expertise: Brickwork expertise + pouring.
Furnace flue work: Brick removal with jackhammer; furnace bricklaying; brick cutting; tuyere formwork and pouring (AS 160 concrete and nose with R25 concrete); Nosering demolition; Nosering formwork and pouring; downstream retaining ring formwork and pouring; door beam formwork and pouring. visit to the furnace entrance.
Chimney work expertise: Brickwork expertise + pouring.
Year 2020:
Tunnel and silo bottom maintenance: Maintenance of the tunnel and bottom of Silo No. 01.
Chlef Cement Plant Chimney Work: Chimney work including concrete pouring, bricklaying, repairs, and mechanical maintenance at the Chlef Cement Plant, and provision of qualified personnel at the Chlef Cement Plant.
Year 2021:
Supply of refractory concrete: Alfran Tix 85 refractory concrete, felt for expansion joints.
Year 2022:
Supply of refractory concrete: High-alumina, low-cement refractory concrete. High-temperature (H/T) alumina castable concrete.
Year 2023:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete, high-alumina, low-cement refractory concrete.
Flue lining work on preheater tower, line 03: Flue lining work at the Chlef cement plant.
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Flue lining and mechanical work: Flue lining work and provision of personnel at the ECDE; installation of refractory concrete; mechanical work, removal of the ring retaining the furnace bricks.
Flue and mechanical work on the preheater tower: As per the work schedules for flue and mechanical/boiler work, shotcrete application for the heating hood, cyclone, coolers, and smoke box; provision of a scaffolding erector, a versatile welder, and a mechanic.
Tunnel and silo bottom maintenance: Maintenance of the tunnel and bottom of Silo No. 01.
Chlef Cement Plant Chimney Work: Chimney work including concrete pouring, bricklaying, repairs, and mechanical maintenance at the Chlef Cement Plant, and provision of qualified personnel at the Chlef Cement Plant.
Year 2021:
Supply of refractory concrete: Alfran Tix 85 refractory concrete, felt for expansion joints.
Year 2022:
Supply of refractory concrete: High-alumina, low-cement refractory concrete. High-temperature (H/T) alumina castable concrete.
Year 2023:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete, high-alumina, low-cement refractory concrete.
Flue lining work on preheater tower, line 03: Flue lining work at the Chlef cement plant.
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Flue lining and mechanical work: Flue lining work and provision of personnel at the ECDE; installation of refractory concrete; mechanical work, removal of the ring retaining the furnace bricks.
Flue and mechanical work on the preheater tower: As per the work schedules for flue and mechanical/boiler work, shotcrete application for the heating hood, cyclone, coolers, and smoke box; provision of a scaffolding erector, a versatile welder, and a mechanic.
Year 2021:
Supply of refractory concrete.
Year 2022:
SME Zahana Project: Additional repair work on the EVS tower at the SCIZ cement plant; shotcrete application; demolition and installation of insulating refractory bricks; flue liner and cyclone roof with IPE 120 support welding; demolition and installation of seamless liner bricks with IPE 120 support. Dismantling and assembly of cyclone skirts No. 04 from the old line; provision of 5 welders for a period of 4 days.
Year 2023:
Preheater diagnostic inspection: Diagnostic inspection of the condition of the preheater on the new line (using climbers); supply of refractory concrete.
Year 2024:
Supply of refractory concrete. (x2)
Repair work on the EVS tower and fluework: Repair work on the EVS tower at the Zahana Cement Plant; mechanical maintenance and fluework on the preheater tower (via SME).
Year 2025:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2022:
SME Zahana Project: Additional repair work on the EVS tower at the SCIZ cement plant; shotcrete application; demolition and installation of insulating refractory bricks; flue liner and cyclone roof with IPE 120 support welding; demolition and installation of seamless liner bricks with IPE 120 support. Dismantling and assembly of cyclone skirts No. 04 from the old line; provision of 5 welders for a period of 4 days.
Year 2023:
Preheater diagnostic inspection: Diagnostic inspection of the condition of the preheater on the new line (using climbers); supply of refractory concrete.
Year 2024:
Supply of refractory concrete. (x2)
Repair work on the EVS tower and fluework: Repair work on the EVS tower at the Zahana Cement Plant; mechanical maintenance and fluework on the preheater tower (via SME).
Year 2025:
Supply of refractory concrete.
Year 2021:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
SCIMAT fluework: Fluework and provision of personnel; removal of the ring holding the furnace bricks at the Saoura; fluework at the preheater furnace; installation of the boiler fluework.
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
SCIMAT fluework: Fluework and provision of personnel; removal of the ring holding the furnace bricks at the Saoura; fluework at the preheater furnace; installation of the boiler fluework.
Year 2021:
Demolition work and installation of refractory concrete for the cooler: Demolition work and installation of refractory concrete for the cooler and the heating hood.
Year 2023:
Supply of refractory concrete: High-alumina refractory concrete.
Year 2024:
Supply of refractory concrete: High-alumina self-leveling concrete.
Demolition work and installation of refractory concrete for the cooler: Demolition work and installation of refractory concrete for the cooler and the heating hood.
Year 2023:
Supply of refractory concrete: High-alumina refractory concrete.
Year 2024:
Supply of refractory concrete: High-alumina self-leveling concrete.
Year 2021:
Supply of refractory concrete: High-alumina refractory concrete.
Year 2024:
Supply of refractory concrete: High-alumina refractory concrete.
Supply of refractory concrete: High-alumina refractory concrete.
Year 2024:
Supply of refractory concrete: High-alumina refractory concrete.
Year 2022:
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2025:
Supply and refractory work: Installation of refractory concrete, ceramic fiber, and stainless steel anchors; filling of cracks with ceramic fiber; demolition of the first layer of dense concrete on the furnace flue ceiling.
Supply of 25 mm thick ceramic fiber with a density of 128 kg/m³, stainless steel anchors.
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2025:
Supply and refractory work: Installation of refractory concrete, ceramic fiber, and stainless steel anchors; filling of cracks with ceramic fiber; demolition of the first layer of dense concrete on the furnace flue ceiling.
Supply of 25 mm thick ceramic fiber with a density of 128 kg/m³, stainless steel anchors.
2022:
Supply of refractory concrete.
2024:
Miscellaneous plant work: Installation of rotary kiln lining; work on the crusher plate plant; supply of refractory concrete.
Supply of refractory concrete.
2024:
Miscellaneous plant work: Installation of rotary kiln lining; work on the crusher plate plant; supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2021:
Provision of arc-air personnel: Provision of specialized arc-air personnel working as site supervisors for SME at the Chlef Cement Plant.
Year 2024:
Chimney work and cement plant maintenance: Refurbishment work on the EVS tower at the Zahana Cement Plant; mechanical and chimney work on the preheater tower and scaffolding rental at the Ain El Kbira Cement Plant; chimney work on the preheater tower at the SME site at the Ain El Kbira Cement Plant; contract for the completion of flue lining work on the preheater tower and provision of qualified personnel at the Ain El Kbira Cement Plant.
Removal of brick retaining ring: Removal of the brick retaining ring (plasma and air arc cutting), kiln diameter 4.30 m.
Bricklaying and concrete work: Spinel magnesia brickwork; MTA alumina brickwork; concrete work in the cooler (4 compartments and heating hood); concrete work in the tertiary air system (½ compartment); concrete work in the flue box (½ compartment); concrete work on the nozzle (1 linear meter) (Appendix 289).
Boiler fluework: Installation of the boiler fluework at the SME workshops; transport of CARATH LB EL1103G concrete; concrete pouring services.
SME Chlef flue work: Flue work at the SME construction site at the Chlef cement plant according to flue/mechanical work specifications.
Year 2025:
Flue lining work on the reheating furnace floor: Flue lining work on the floor of the reheating furnace at the SME construction site in Fondal Msila.
Supply of refractory concrete. (x2)
Year 2026:
Cement silo cleaning: Cleaning of two cement silos, 15.4 m high and 17.5 m in diameter, at the Adrar cement plant; inspection of compressed air pipes and valves; unclogging of compressed air pipes and valves; cleaning of the interior of the silos and removal of stagnant material.
Provision of masons and welders: 8 masons for a period of 15 days; 4 welders for a period of 10 days.
Provision of arc-air personnel: Provision of specialized arc-air personnel working as site supervisors for SME at the Chlef Cement Plant.
Year 2024:
Chimney work and cement plant maintenance: Refurbishment work on the EVS tower at the Zahana Cement Plant; mechanical and chimney work on the preheater tower and scaffolding rental at the Ain El Kbira Cement Plant; chimney work on the preheater tower at the SME site at the Ain El Kbira Cement Plant; contract for the completion of flue lining work on the preheater tower and provision of qualified personnel at the Ain El Kbira Cement Plant.
Removal of brick retaining ring: Removal of the brick retaining ring (plasma and air arc cutting), kiln diameter 4.30 m.
Bricklaying and concrete work: Spinel magnesia brickwork; MTA alumina brickwork; concrete work in the cooler (4 compartments and heating hood); concrete work in the tertiary air system (½ compartment); concrete work in the flue box (½ compartment); concrete work on the nozzle (1 linear meter) (Appendix 289).
Boiler fluework: Installation of the boiler fluework at the SME workshops; transport of CARATH LB EL1103G concrete; concrete pouring services.
SME Chlef flue work: Flue work at the SME construction site at the Chlef cement plant according to flue/mechanical work specifications.
Year 2025:
Flue lining work on the reheating furnace floor: Flue lining work on the floor of the reheating furnace at the SME construction site in Fondal Msila.
Supply of refractory concrete. (x2)
Year 2026:
Cement silo cleaning: Cleaning of two cement silos, 15.4 m high and 17.5 m in diameter, at the Adrar cement plant; inspection of compressed air pipes and valves; unclogging of compressed air pipes and valves; cleaning of the interior of the silos and removal of stagnant material.
Provision of masons and welders: 8 masons for a period of 15 days; 4 welders for a period of 10 days.
Year 2025:
Supply of ceramic fiber gaskets.
Supply of ceramic fiber gaskets.
Year 2020:
Flue work during the kiln shutdown: Tertiary air duct; burner casing repair; burner casing; kiln brickwork; VRM skirt replacement; kiln upstream seal. HotGas generator of the cement mill; repair on the kiln (multiple interventions).
Year 2022:
Manufacturing and installation of metal infrastructures: Manufacturing and assembly of two metal platforms serving as support for the bag filters and a platform for access to the filter fan; installation on both lines. Supply: Wicketh, Panel.
Year 2023:
Refractory work on the furnace: Repair of burned and deformed plates; disassembly and reassembly of the furnace entry segment; disassembly and reassembly of the entire "bucket" lifters; disassembly of wear rings (mobile side); securing the elbow of the calciner duct; supply and assembly of scaffolding; vibrated cast concrete for entry segments and spouts; demolition of the nose and tuyere concrete; brick placement of 1m² at point 52M of the furnace; lateral wall of the cooler.
Supply of refractory concretes.
Year 2024:
Complete work on the furnace: ML scaling; ML brick removal; bricklaying with mortar; bricklaying without mortar; cutting installation; assembly and disassembly of the bricklaying machine; concrete removal; concreting; disassembly of the big bag including the platform and sleeve filters and relocation to silo 4; assembly of the BIG BAG including the platform and sleeve filters; provision of scaffolding, conduits, anchors, and consumables.
Year 2026:
Refractory work for rotary kiln: Brick lining, concrete pouring for preheating tower box, sheet metal welding and anchoring, brick removal + brick installation + machine assembly and disassembly + brick cutting.
Flue work during the kiln shutdown: Tertiary air duct; burner casing repair; burner casing; kiln brickwork; VRM skirt replacement; kiln upstream seal. HotGas generator of the cement mill; repair on the kiln (multiple interventions).
Year 2022:
Manufacturing and installation of metal infrastructures: Manufacturing and assembly of two metal platforms serving as support for the bag filters and a platform for access to the filter fan; installation on both lines. Supply: Wicketh, Panel.
Year 2023:
Refractory work on the furnace: Repair of burned and deformed plates; disassembly and reassembly of the furnace entry segment; disassembly and reassembly of the entire "bucket" lifters; disassembly of wear rings (mobile side); securing the elbow of the calciner duct; supply and assembly of scaffolding; vibrated cast concrete for entry segments and spouts; demolition of the nose and tuyere concrete; brick placement of 1m² at point 52M of the furnace; lateral wall of the cooler.
Supply of refractory concretes.
Year 2024:
Complete work on the furnace: ML scaling; ML brick removal; bricklaying with mortar; bricklaying without mortar; cutting installation; assembly and disassembly of the bricklaying machine; concrete removal; concreting; disassembly of the big bag including the platform and sleeve filters and relocation to silo 4; assembly of the BIG BAG including the platform and sleeve filters; provision of scaffolding, conduits, anchors, and consumables.
Year 2026:
Refractory work for rotary kiln: Brick lining, concrete pouring for preheating tower box, sheet metal welding and anchoring, brick removal + brick installation + machine assembly and disassembly + brick cutting.
LAFARGE HOLCIM CILAS SPA
Year 2020:
Refractory work and maintenance: Repair and maintenance, subcontracting.
LAFARGE HOLCIM OGGAZ
Year 2020:
Refractory lining work for rotary kilns: Installation of kiln bricks with mortar and without mortar; installation of AGC kiln bricks with mortar; installation of brick cutting with clamping plates (crossed and simple); demolition of the refractory at the downstream nose ring (cutting anchors and cleaning plates); concreting the downstream nose ring with anchors and joints; demolition of the refractory at the downstream nose ring, anchors and cleaning plates; concreting, installation of metal or ceramic anchors, plate or fiber insulation, formwork for poured and vibrated concrete.
Year 2021:
Briquetage installation: Furnace briquetage work.
Year 2023:
Supply of refractory concrete.
Year 2020:
Refractory work and maintenance: Repair and maintenance, subcontracting.
LAFARGE HOLCIM OGGAZ
Year 2020:
Refractory lining work for rotary kilns: Installation of kiln bricks with mortar and without mortar; installation of AGC kiln bricks with mortar; installation of brick cutting with clamping plates (crossed and simple); demolition of the refractory at the downstream nose ring (cutting anchors and cleaning plates); concreting the downstream nose ring with anchors and joints; demolition of the refractory at the downstream nose ring, anchors and cleaning plates; concreting, installation of metal or ceramic anchors, plate or fiber insulation, formwork for poured and vibrated concrete.
Year 2021:
Briquetage installation: Furnace briquetage work.
Year 2023:
Supply of refractory concrete.
Year 2021:
Maintenance and repair: Maintenance and repair of preheater tower; maintenance and repair of clinker conveyor.
Maintenance and repair: Maintenance and repair of preheater tower; maintenance and repair of clinker conveyor.
Year 2025 :
Refractory maintenance and repair services for industrial complexes.
Refractory maintenance and repair services for industrial complexes.
Year 2024:
Refractory repair work: Refractory repair work (spraying, vibrated casting, and welding of anchors) on regenerator 530-R-002 of the RGCC unit at the Algiers refinery. Human Resources: 1 HSE Manager, 2 refractory supervisors, 6 refractory masons, 3 welders, 5 certified general laborers. Supplies: Seven Cast D RAM 52, Seven D RAM 90 CR, Comp. B Chemical Binder (monoaluminum phosphate), Sevenlite 1450 LIP.
Refractory repair work: Refractory repair work (spraying, vibrated casting, and welding of anchors) on regenerator 530-R-002 of the RGCC unit at the Algiers refinery. Human Resources: 1 HSE Manager, 2 refractory supervisors, 6 refractory masons, 3 welders, 5 certified general laborers. Supplies: Seven Cast D RAM 52, Seven D RAM 90 CR, Comp. B Chemical Binder (monoaluminum phosphate), Sevenlite 1450 LIP.
2021:
Supply of refractory cement.
2024:
Supply of refractory concrete.
Supply of refractory cement.
2024:
Supply of refractory concrete.
Year 2021:
Supply of refractory concrete.
Year 2022:
Supply of refractory concrete.
Year 2023:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2026:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2022:
Supply of refractory concrete.
Year 2023:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2026:
Supply of refractory concrete.
Year 2020:
Maintenance and insulation work: Installation of refractory insulation on the following equipment: Primary – reformer expansion bellows 203B001 / 203B002; Steam Superheater 203 E 002; Process Gas Cooler 203 E 001. Repair and maintenance, subcontracted.
Year 2022:
High-temperature insulation services (flue gas/refractory): Work on equipment 203B001, 203B002.
Year 2024:
High-temperature insulation services (flue lining/refractory): Work on certain parts of equipment 1038001 / 1038001-X04 / 1038001-X05 / 1038002 / 103R001 / 103E001 / 103E002 / 083U100 / 083U200 / 083U300.
Year 2025:
Refractory insulation: Refractory insulation work.
Year 2026:
Refractory insulation: Refractory insulation work.
Maintenance and insulation work: Installation of refractory insulation on the following equipment: Primary – reformer expansion bellows 203B001 / 203B002; Steam Superheater 203 E 002; Process Gas Cooler 203 E 001. Repair and maintenance, subcontracted.
Year 2022:
High-temperature insulation services (flue gas/refractory): Work on equipment 203B001, 203B002.
Year 2024:
High-temperature insulation services (flue lining/refractory): Work on certain parts of equipment 1038001 / 1038001-X04 / 1038001-X05 / 1038002 / 103R001 / 103E001 / 103E002 / 083U100 / 083U200 / 083U300.
Year 2025:
Refractory insulation: Refractory insulation work.
Year 2026:
Refractory insulation: Refractory insulation work.
Year 2024: ANNABA
Flue work on Furnace 101B: Flue work on Furnace 101B in the client’s Ammonia unit at its site in Annaba.
Inspection and repair of reformer thermal insulation: Provision of personnel specialized in the inspection and repair of reformer thermal insulation during the 2024 scheduled shutdown of the AOA SPA plant; settlement of services performed during the unscheduled shutdown; provision of a supervisor and 5 technical staff for flue gas ductwork + materials.
Year 2025: ANNABA & ORAN
Boiler H5101 A flue work: Flue work on boiler H5101 A; supply and installation of refractory materials according to the manufacturer’s plans and documentation.
Additional boiler flue work: Flue work (additional work) on boilers H5101 C/D; civil engineering work on the NH3 platform; demolition of deteriorated concrete around both boilers; pouring of new concrete on the roof; repair of the H5101C burner wall; repair of the H5101D superheater wall; formwork and pouring of access doors.
Refractory work on technical installations: Refractory work on technical installations.
Boiler H5101A flue work (recurring): Supply and installation of refractory materials at H5101A.
Year 2026: ANNABA & ORAN
Removal and installation of internal piping and ductwork for secondary reforming unit 103-D: Removal and installation of internal piping and ductwork at the secondary reforming unit, location 103-D; demolition and installation of refractories (dense refractory concrete using pneumatic jackhammers, including removal); supply and installation of 304L stainless steel anchors and studs; installation of formwork according to the manufacturer’s plans and recommendations; fabrication of drying chimney; process drying of refractory concrete according to the drying curve.
Installation of dome and hexagonal bricks: Installation of dome according to plans and installation of hexagonal bricks after catalyst application; removal and installation of internal components.
Flue work on Furnace 101B: Flue work on Furnace 101B in the client’s Ammonia unit at its site in Annaba.
Inspection and repair of reformer thermal insulation: Provision of personnel specialized in the inspection and repair of reformer thermal insulation during the 2024 scheduled shutdown of the AOA SPA plant; settlement of services performed during the unscheduled shutdown; provision of a supervisor and 5 technical staff for flue gas ductwork + materials.
Year 2025: ANNABA & ORAN
Boiler H5101 A flue work: Flue work on boiler H5101 A; supply and installation of refractory materials according to the manufacturer’s plans and documentation.
Additional boiler flue work: Flue work (additional work) on boilers H5101 C/D; civil engineering work on the NH3 platform; demolition of deteriorated concrete around both boilers; pouring of new concrete on the roof; repair of the H5101C burner wall; repair of the H5101D superheater wall; formwork and pouring of access doors.
Refractory work on technical installations: Refractory work on technical installations.
Boiler H5101A flue work (recurring): Supply and installation of refractory materials at H5101A.
Year 2026: ANNABA & ORAN
Removal and installation of internal piping and ductwork for secondary reforming unit 103-D: Removal and installation of internal piping and ductwork at the secondary reforming unit, location 103-D; demolition and installation of refractories (dense refractory concrete using pneumatic jackhammers, including removal); supply and installation of 304L stainless steel anchors and studs; installation of formwork according to the manufacturer’s plans and recommendations; fabrication of drying chimney; process drying of refractory concrete according to the drying curve.
Installation of dome and hexagonal bricks: Installation of dome according to plans and installation of hexagonal bricks after catalyst application; removal and installation of internal components.
Year 2024:
Provision of flue personnel: Provision of a supervisor and 05 flue technicians + Equipment during the 2024 program shutdown; regularization of services performed during the accidental shutdown.
Provision of flue personnel: Provision of a supervisor and 05 flue technicians + Equipment during the 2024 program shutdown; regularization of services performed during the accidental shutdown.
Year 2025:
Repair of furnace refractory bricks: Repair and replacement of refractory bricks in areas susceptible to water jet erosion; sealing of manholes with refractory brick structures; filling of cracks and joints between the installed bricks with mortar.
Repair of furnace refractory bricks: Repair and replacement of refractory bricks in areas susceptible to water jet erosion; sealing of manholes with refractory brick structures; filling of cracks and joints between the installed bricks with mortar.
Year 2023:
Repair of DRI furnace refractories and insulation: Repair of the refractories in the DRI furnace and the DRI unit; repair of the insulation in the smoking chamber; additional work. Supplies: 95% alumina ceramic anchors, AISI 310 stainless steel anchors (220 mm long, 60° angle, 8 mm diameter), mobilization/demobilization of various equipment.
Year 2024:
Complete work on the DRP unit – shutdown: Supply of refractory concrete and repair of the DRI shaft furnace and the refractory-lined duct of the DRI furnace and DRI unit at the AQS complex; Reformer Roof insulation repair – installation of 5 layers of ceramic fiber rolls (38.5 mm thick) and 3 layers (25 mm thick); cleaning of the DRI furnace walls; provision of rope access technicians and general laborers; provision of 5 welders and 10 technicians. Supplies: Seven Top Gun 50 NH 01 W concrete, Sevenlite 1350 LI concrete, Seven Gun 61 NH CO ALK concrete, abrasion-resistant castable concrete, Seven Cem 50 AM HS mortar, ceramic fibers.
Year 2025:
Rope access work on the DRI furnace: 4 rope access technicians, 1 rope access assistant, and 1 coordinator for rope access work on the DRI furnace (duration: 24 hours).
Cleaning of DRI furnace walls by rope access technicians: Cleaning of the DRI furnace walls by rope access technicians.
Rope access work on the DRI furnace: Rope access work on the DRI furnace.
Year 2026:
Refractory supply and repair: Supply of refractory materials: lightweight insulating castable, low-iron abrasion-resistant castable, Super Duty Air Setting Mortar; rope access technician for interior furnace spraying.
Repair of DRI furnace refractories and insulation: Repair of the refractories in the DRI furnace and the DRI unit; repair of the insulation in the smoking chamber; additional work. Supplies: 95% alumina ceramic anchors, AISI 310 stainless steel anchors (220 mm long, 60° angle, 8 mm diameter), mobilization/demobilization of various equipment.
Year 2024:
Complete work on the DRP unit – shutdown: Supply of refractory concrete and repair of the DRI shaft furnace and the refractory-lined duct of the DRI furnace and DRI unit at the AQS complex; Reformer Roof insulation repair – installation of 5 layers of ceramic fiber rolls (38.5 mm thick) and 3 layers (25 mm thick); cleaning of the DRI furnace walls; provision of rope access technicians and general laborers; provision of 5 welders and 10 technicians. Supplies: Seven Top Gun 50 NH 01 W concrete, Sevenlite 1350 LI concrete, Seven Gun 61 NH CO ALK concrete, abrasion-resistant castable concrete, Seven Cem 50 AM HS mortar, ceramic fibers.
Year 2025:
Rope access work on the DRI furnace: 4 rope access technicians, 1 rope access assistant, and 1 coordinator for rope access work on the DRI furnace (duration: 24 hours).
Cleaning of DRI furnace walls by rope access technicians: Cleaning of the DRI furnace walls by rope access technicians.
Rope access work on the DRI furnace: Rope access work on the DRI furnace.
Year 2026:
Refractory supply and repair: Supply of refractory materials: lightweight insulating castable, low-iron abrasion-resistant castable, Super Duty Air Setting Mortar; rope access technician for interior furnace spraying.
Year 2022:
Technical support services.
Year 2023:
Technical support services.
Year 2024:
Technical support services: supply of high-alumina refractory concrete.
Year 2025:
Technical support services.
Technical support services.
Year 2023:
Technical support services.
Year 2024:
Technical support services: supply of high-alumina refractory concrete.
Year 2025:
Technical support services.
Year 2022:
Furnace hearth repair: Repair of the MS furnace hearth.
Year 2023:
Contract for the supply and installation of refractory concrete.
Year 2024:
Furnace refractory repair and additional work: Repair of the furnace’s refractory concrete; installation of 1.5 tons of refractory concrete; demolition, cleaning, anchoring, formwork, and concrete pouring services for a duration of 2 days (additional work); production of concrete blocks; fabrication of concrete boxes for the furnace sampling doors. Supply of Alfran Tix 84 refractory concrete, 6 mm omega anchors.
Furnace hearth repair: Repair of the MS furnace hearth.
Year 2023:
Contract for the supply and installation of refractory concrete.
Year 2024:
Furnace refractory repair and additional work: Repair of the furnace’s refractory concrete; installation of 1.5 tons of refractory concrete; demolition, cleaning, anchoring, formwork, and concrete pouring services for a duration of 2 days (additional work); production of concrete blocks; fabrication of concrete boxes for the furnace sampling doors. Supply of Alfran Tix 84 refractory concrete, 6 mm omega anchors.
Year 2023:
Construction of the arch furnace vault: Construction of the arch furnace vault using refractory concrete according to the plans. Supply of refractory concrete and anchors.
Construction of the arch furnace vault: Construction of the arch furnace vault using refractory concrete according to the plans. Supply of refractory concrete and anchors.
Year 2025 :
Supply of refractory concrete.
Supply of refractory concrete.
Year 2020:
Provision of personnel: Provision of qualified personnel.
Year 2022:
Provision of maintenance personnel: Provision of mechanics, team leader, and forklift.
Year 2023:
Refractory work and furnace maintenance: Work on the flue box; concrete demolition of the entry segments and the flow vault; vibrated cast concrete of the tuyere; formwork; provision of team leader, mechanic, and HSE; insulation repair service for the dryer; filter renovation service + grating installation; provision of supervisor, mechanic, and tools; provision of supervisor, welder, and mechanic. Supply of refractory concrete.
Year 2024:
Silo repair work: Mec. Silo repair work UP; SPV. Silo repair work UP; Mec. HSE Nealite work; SPV. HSE Nealite work; Mec. Mixing platform work; SPV. Mixing platform work.
Year 2025:
HSE fencing line humid work: HSE fencing line humid work, Mec. and SPV.
Utility and mill works: Mec. Utility work, Mec. Works mill 2FTEX5J, Mec. Works mixer 2FTEX5J, Mec. Works cone silo assembly.
Provision of welders on the KNAUF site: Provision of SCOMEQ welders on the KNAUF site.
Welding work mix: Mech. and SPV. Welding work, disassembly of the microsilica doser.
Work on the installation of the doser: Mec. and SPV. Work on installing the dispenser.
Year 2026:
Powder, plate, and utility maintenance work: Mec./SPV. Powder maintenance work, Mec./SPV. Utility maintenance work.
Provision of personnel: Provision of qualified personnel.
Year 2022:
Provision of maintenance personnel: Provision of mechanics, team leader, and forklift.
Year 2023:
Refractory work and furnace maintenance: Work on the flue box; concrete demolition of the entry segments and the flow vault; vibrated cast concrete of the tuyere; formwork; provision of team leader, mechanic, and HSE; insulation repair service for the dryer; filter renovation service + grating installation; provision of supervisor, mechanic, and tools; provision of supervisor, welder, and mechanic. Supply of refractory concrete.
Year 2024:
Silo repair work: Mec. Silo repair work UP; SPV. Silo repair work UP; Mec. HSE Nealite work; SPV. HSE Nealite work; Mec. Mixing platform work; SPV. Mixing platform work.
Year 2025:
HSE fencing line humid work: HSE fencing line humid work, Mec. and SPV.
Utility and mill works: Mec. Utility work, Mec. Works mill 2FTEX5J, Mec. Works mixer 2FTEX5J, Mec. Works cone silo assembly.
Provision of welders on the KNAUF site: Provision of SCOMEQ welders on the KNAUF site.
Welding work mix: Mech. and SPV. Welding work, disassembly of the microsilica doser.
Work on the installation of the doser: Mec. and SPV. Work on installing the dispenser.
Year 2026:
Powder, plate, and utility maintenance work: Mec./SPV. Powder maintenance work, Mec./SPV. Utility maintenance work.
Year 2021 :
Supply of mortar.
Year 2022 :
Supply of refractory concrete and anchors.
Year 2023 :
Supply of refractory concrete.
Year 2024 :
Supply of Refractory Concrete.
Year 2025 :
Supply of Concrete.
Supply of mortar.
Year 2022 :
Supply of refractory concrete and anchors.
Year 2023 :
Supply of refractory concrete.
Year 2024 :
Supply of Refractory Concrete.
Year 2025 :
Supply of Concrete.
Year 2025:
Supply of refractory mortar.
Supply of refractory mortar.
Year 2025: Project / Nature of work: Supply of refractory concrete.
Year 2025:
Supply and installation of refractory: Supply of concrete, installation of refractory.
Supply and installation of refractory: Supply of concrete, installation of refractory.
Year 2025:
Provision of personnel: Provision of a mechanic; provision of a multi-skilled agent; provision of a team for insulation work.
Provision of personnel: Provision of a mechanic; provision of a multi-skilled agent; provision of a team for insulation work.
Year 2025:
Refractory concrete lining for smoke burner: Implementation of refractory concrete lining for a smoke burner (16m²). Concrete supply.
Year 2026:
Refractory concrete lining for smoke burner (recurrence): Refractory concrete lining work for a smoke burner.
Refractory concrete lining for smoke burner: Implementation of refractory concrete lining for a smoke burner (16m²). Concrete supply.
Year 2026:
Refractory concrete lining for smoke burner (recurrence): Refractory concrete lining work for a smoke burner.
Year 2025:
Project / Nature of the work: Supply of refractory materials, refractory concrete.
Project / Nature of the work: Supply of refractory materials, refractory concrete.
Year 2025:
Installation of refractory materials for combustion chamber: Implementation and installation of refractory materials for the combustion chamber in a wood processing plant in Chelghoum Laid (Wilaya of Mila).
Supply of refractory concrete.
Refractory drying of the combustion chamber: Execution of the refractory drying operation of a combustion chamber; assistance from two supervisors throughout the entire drying process; provision of a 750 kJ burner, installation and connection of the burner, disassembly and recovery of the burner.
Supply of ceramic fiber.
Installation of refractory materials for combustion chamber: Implementation and installation of refractory materials for the combustion chamber in a wood processing plant in Chelghoum Laid (Wilaya of Mila).
Supply of refractory concrete.
Refractory drying of the combustion chamber: Execution of the refractory drying operation of a combustion chamber; assistance from two supervisors throughout the entire drying process; provision of a 750 kJ burner, installation and connection of the burner, disassembly and recovery of the burner.
Supply of ceramic fiber.
Year 2021: Project / Nature of work: Supply of refractory concrete.
Year 2022: Project / Nature of work: Supply of refractory concrete.
Year 2022: Project / Nature of work: Supply of refractory concrete.
Year 2023:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2023:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2025 :
Industrial furnace maintenance services and refractory installation.
Industrial furnace maintenance services and refractory installation.
Year 2021:
Project / Nature of the work: Supply of refractory concrete and specialized maintenance for industrial furnaces.
Project / Nature of the work: Supply of refractory concrete and specialized maintenance for industrial furnaces.
Year 2023:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete and anchors: Supply of refractory concrete, refractory anchors.
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete and anchors: Supply of refractory concrete, refractory anchors.
Year 2025:
Project / Nature of the work: Supply of refractory concrete.
Project / Nature of the work: Supply of refractory concrete.
Year 2024:
Manufacturing and assembly of the Renault chain: Study, manufacturing, and assembly at the Renault chain level.
Manufacturing and assembly of the Renault chain: Study, manufacturing, and assembly at the Renault chain level.
Year 2021:
Project / Nature of the work: Renovation of chamber oven and crest bath
Renovation work on chamber kilns, repair and renovation of crest baths. Supply of refractory concrete and refractory cement.
Year 2022: Project / Nature of work: Supply of refractory concrete.
Year 2024: Project / Nature of the work: Construction of cementation hot bath
Service provision for the construction of the hot cementation bath.
Supply of refractory concrete.
Project / Nature of the work: Renovation of chamber oven and crest bath
Renovation work on chamber kilns, repair and renovation of crest baths. Supply of refractory concrete and refractory cement.
Year 2022: Project / Nature of work: Supply of refractory concrete.
Year 2024: Project / Nature of the work: Construction of cementation hot bath
Service provision for the construction of the hot cementation bath.
Supply of refractory concrete.
Year 2025 :
Project / Nature of work: Supply of refractory concrete.
Project / Nature of work: Supply of refractory concrete.
Year 2023:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2023:
Refractory repair, boiler work, and incinerator concreting: Refractory repair, boiler work, and concreting of the incinerator door. Supply of refractory concrete, stainless steel anchors, and steel plates.
Year 2024:
Installation of refractories: Installation of refractories; supply of insulating bricks, mortar, insulating concrete, dense concrete, flat iron, anchoring, ceramic fiber, black sheet metal, stainless steel casing.
Year 2025:
Supply and installation of incinerator refractories: Supply of dense concrete, flat iron, anchoring, ceramic fiber, black sheet metal, stainless steel casing, 6mm black sheet metal; services of refurbishment, welding, formwork, and concrete pouring.
Refractory repair, boiler work, and incinerator concreting: Refractory repair, boiler work, and concreting of the incinerator door. Supply of refractory concrete, stainless steel anchors, and steel plates.
Year 2024:
Installation of refractories: Installation of refractories; supply of insulating bricks, mortar, insulating concrete, dense concrete, flat iron, anchoring, ceramic fiber, black sheet metal, stainless steel casing.
Year 2025:
Supply and installation of incinerator refractories: Supply of dense concrete, flat iron, anchoring, ceramic fiber, black sheet metal, stainless steel casing, 6mm black sheet metal; services of refurbishment, welding, formwork, and concrete pouring.
Year 2021:
Project / Nature of the work: Installation and supply of refractory concrete.
Year 2024:
Project / nature of the work: Supply of refractory concrete.
Year 2026:
Project / Nature of the work: Supply of fastening materials and fiber
Stainless steel anchor 150mm long, black sheet metal holders for anchor fixation, ceramic fiber density 96 kg/m3.
Project / Nature of the work: Installation and supply of refractory concrete.
Year 2024:
Project / nature of the work: Supply of refractory concrete.
Year 2026:
Project / Nature of the work: Supply of fastening materials and fiber
Stainless steel anchor 150mm long, black sheet metal holders for anchor fixation, ceramic fiber density 96 kg/m3.
Year 2025 :
Project / Nature of work: Supply of refractory concrete.
Project / Nature of work: Supply of refractory concrete.
Year 2024:
Provision of maintenance personnel: Provision of a supervisor; provision of a technician in mechanics (welder).
Provision of maintenance personnel: Provision of personnel for maintenance work.
Year 2025:
Provision of welders: Provision of welders on the KNAUF site, provision of a mobile scaffold for 7 days.
Provision of TS in mechanics: Provision of TS in mechanics.
Provision of welders on a recurring basis: Provision of TS in mechanics (welder).
Provision of maintenance personnel: Provision of a supervisor; provision of a technician in mechanics (welder).
Provision of maintenance personnel: Provision of personnel for maintenance work.
Year 2025:
Provision of welders: Provision of welders on the KNAUF site, provision of a mobile scaffold for 7 days.
Provision of TS in mechanics: Provision of TS in mechanics.
Provision of welders on a recurring basis: Provision of TS in mechanics (welder).
Year 2026:
Supply of refractory materials: Concrete; stainless steel anchor rods; ceramic fiber.
Refractory installation for Stein boilers: Service for the installation of refractory for Stein boilers.
Supply of refractory materials: Concrete; stainless steel anchor rods; ceramic fiber.
Refractory installation for Stein boilers: Service for the installation of refractory for Stein boilers.
Year 2021:
Supply of refractory concrete.
Year 2022:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2026:
Supply of refractory concrete.
Supply of refractory concrete.
Year 2022:
Supply of refractory concrete.
Year 2024:
Supply of refractory concrete.
Year 2025:
Supply of refractory concrete.
Year 2026:
Supply of refractory concrete.
Year 2021:
Supply of refractory concrete.
Year 2024:
Refractory and framework work: Supply of refractory concrete; demolition, cleaning, and installation of the supply; supply of refractory concrete.
Year 2025:
Cutting and refractory installation work: Demolition of the old concrete; cutting of the worn-out sheet metal; installation of insulating concrete; installation with welding of the new sheet metal; installation of dense concrete; monitoring of drying.
Cutting, cleaning, and welding of the plate: Cutting with cleaning of 2m² of the charred plate of the casing; installation, adjustment, and welding of the 8mm plate around the burner; installation, adjustment, and welding of the 6mm plate of the casing; bending of the 6mm plate.
Supply of refractory concrete.
Year 2024:
Refractory and framework work: Supply of refractory concrete; demolition, cleaning, and installation of the supply; supply of refractory concrete.
Year 2025:
Cutting and refractory installation work: Demolition of the old concrete; cutting of the worn-out sheet metal; installation of insulating concrete; installation with welding of the new sheet metal; installation of dense concrete; monitoring of drying.
Cutting, cleaning, and welding of the plate: Cutting with cleaning of 2m² of the charred plate of the casing; installation, adjustment, and welding of the 8mm plate around the burner; installation, adjustment, and welding of the 6mm plate of the casing; bending of the 6mm plate.
Year 2025 :
Project / Nature of work: Supply of refractory concrete.
Project / Nature of work: Supply of refractory concrete.